How Long Does a Full Home Renovation Really Take

One of the first questions homeowners ask when planning a renovation is: “How long will it take?” It’s a fair question — remodeling impacts your daily life, and timelines matter when you’re investing serious money into your home.
At Takes Two Construction, we believe in being transparent about the process. The truth is, timelines vary depending on scope, complexity, and whether clients add changes along the way. To give you clarity, let’s break down what influences a renovation timeline — and how our Carrollton project demonstrates both eViciency and flexibility.

Typical Renovation Timelines

While every home is diVerent, here’s what North Texas homeowners can generally expect:
• Kitchen Remodel: 2–4 weeks
• Bathroom Remodel: 2–4 weeks
• Full Interior Remodel: 4–6 weeks
• Whole-Home Renovation (interior + exterior): 12–16 weeks

These timelines assume standard scope — meaning the project is defined at the start and completed without major design changes.

What Extends a Timeline?

1. Design Revisions – If homeowners request changes after construction has started, it can mean reordering materials or revising plans.
2. Scope Additions – Adding new work mid-project (such as fencing, patios, or outdoor kitchens) naturally extends duration.
3. Permits & Inspections – Certain upgrades (electrical, structural, irrigation) require city approvals that may cause brief delays.
4. Material Lead Times – Specialty items like custom cabinetry or imported stone can take weeks to arrive.

Case Study: Carrollton Renovation

Our Vasquez Family Renovation in Carrollton is the perfect example. Originally scoped as an exterior renovation, the project expanded into a full interior remodel, outdoor kitchen, irrigation, fencing, siding, and a double-tiered retaining wall.
• Timeline: April – September 2025 (6 months total)
• Typical Duration for Similar Scope: 3 months
• Reason for Extension: Homeowners added multiple scopes of work and design changes throughout the process.

By staying flexible and communicating clearly, we delivered every addition seamlessly — ensuring the clients got their dream home without sacrificing quality.

Why Timelines Matter:

A clear timeline benefits both contractor and homeowner. It:
• Sets realistic expectations
• Reduces stress during construction
• Helps coordinate budgets and temporary living arrangements

At TTC, we build project calendars with buler time for inspections and material delays. This proactive planning prevents surprises and keeps projects moving eViciently.

The TTC Dilerence:

Our approach combines premium subcontractor partnerships with dedicated project management. That means even when timelines extend due to add-ons, our crews stay accountable, and homeowners are kept informed every step of the way.

Planning Your Renovation:

While no two projects are identical, the key takeaway is this:a typical full-home renovation takes about 3 months, but scope changes and additions can extend it.

At Takes Two Construction, we work with you to create a realistic timeline — and adapt when your vision evolves.

👉 Ready to start planning your renovation? Contact us today for a consultation and see how we deliver flexible, elicient, and premium remodelsin North Texas!